Feeder / Packer Gluing - 2nd Shift (5 Day/8 Hour)
Honeymoon Paper Products
- Mansfield, TX
- Permanent
- Full-time
- Trustworthy – We strive for our actions to match our words in all our relationships.
- Servant – Hearted – We enable and empower our team to serve the needs of customers, Team members, suppliers and the community.
- Relational – We aim to build healthy relationships while fostering and environment that promotes compassion, balance, and personal and professional growth.
- Resourceful – We value strategic insourcing, first looking to create solutions internally, and then looking to apply that knowledge to future opportunities.
- Feeding consists of removing blanks from a pallet, checking for quality of product, and placing them into the feed hopper of the gluer machine maintaining the hopper at proper load heights
- It will be the responsibility of the feeder to observe the blanks flowing through the machine and watch for quality and jam-ups, and to alert the Operator of problems or stop the machine
- The feeder will notify the Operator before a new pallet of blanks is needed maintaining adequate blanks into the hopper to ensure there is no interruption in run speeds
- Packing can consist of one or two persons depending on the product and run speed of the carton produced
- A packer will fill a corrugated case with the proper case count by picking up the blanks and placing them uniformly into the case ensuring proper fit, and notifying the Supervisor of any issues
- Maintain quality standards by learning defective characteristic for products, sorting defective parts, and communicating with Machine Operator, Supervisor, and Quality Control staff
- Participate in teamwork: work with others to improve operations, reduce waste, maintain lean manufacturing goals and requirements, answer questions, and communicate with other staff as needed
- Cross train by rotating to different machines and work areas
- Pack cartons according to work order instructions by verifying counts, weighing cartons, and following job ticket and labeling instructions
- Adjust to and follow new procedures and innovations, which would add to the efficiency and safety of the operation
- In accordance with our 5S system, maintain a clean work environment including the machine, floors, desks, and fans
- Effectively utilize any machine downtime (not including approved breaks) by performing other tasks associated with maintaining a clean work environment or as otherwise instructed by a supervisor
2nd Shift (5 Day/8 Hour) - 3:00 PM to 11:00 PM EST
Mansfield Plant - 949 South Sixth Avenue, Mansfield, TX 76063